593-v0 |
PIP2IT MEBT Absorber Status Update |
Curtis Baffes |
MEBT
|
13 Jun 2017 |
2187-v3 |
Analysis of BPM harmonics at PIP2IT MEBT |
Alexander Shemyakin |
MEBT
Technical Meeting
Instrumentation
|
23 Oct 2018 |
1582-v6 |
PIP-II FDR MEBT kicker review |
Alex Chen et al. |
MEBT
Internal Reviews
Front End
|
22 Oct 2018 |
1704-v3 |
Effect of image charges on differential trajectories measurements |
Alexander Shemyakin |
MEBT
Lattice Optics
|
09 Oct 2018 |
1654-v2 |
Characterization of 2.1 MeV H- Beam using Action-Phase Coordinates |
Chris J Richard et al. |
MEBT
Instrumentation
Technical Meeting
|
28 Aug 2018 |
1594-v1 |
Proposal to use integration of current losses in PIP2IT MPS |
Alexander Shemyakin |
MEBT
Front End
Controls
|
31 Jul 2018 |
1509-v1 |
FFC Measurements at PIP-II Injector Test and corresponding Tracewin simulations |
Jean-Paul Carneiro |
MEBT
Technical Meeting
|
05 Jun 2018 |
1347-v1 |
PIP2IT MEBT 50-Ohm kicker deflection characterization |
Lionel R. Prost |
MEBT
Technical Meeting
|
30 Jan 2018 |
1278-v2 |
Update on PIP2IT warm front end |
Alexander Shemyakin |
MEBT
Front End
|
06 Dec 2017 |
1206-v1 |
Update on 200 Ohm kicker driver performance |
Daniil Frolov et al. |
MEBT
Front End
Technical Meeting
Instrumentation
PIP-II Collaboration
|
31 Oct 2017 |
1203-v1 |
Update on beam measurements with the 200 Ohm kicker |
Alexander Shemyakin |
MEBT
|
31 Oct 2017 |
1158-v2 |
PIP2IT Design Handbook |
Paul Derwent |
IS
MEBT
Front End
LEBT
RFQ
DR
Technical Reports
|
27 Sep 2017 |
1013-v3 |
200 Ohm Chopper Progress Update |
Daniil Frolov et al. |
MEBT
Publications
PXIE: IS/LEBT
|
26 Jul 2017 |
1007-v1 |
Measurements of bunch-by-bunch kicking with 200 Ohm kicker |
Alexander Shemyakin |
MEBT
Technical Meeting
|
25 Jul 2017 |
546-v1 |
Protection Electrode Signal Processing Algorithm |
Daniil Frolov et al. |
MEBT
Instrumentation
PIP-II Collaboration
|
09 May 2017 |
223-v1 |
PIP2IT MEBT Kicker Protection Electrode Electronics FRS |
Daniil Frolov et al. |
MEBT
FRS
|
13 Mar 2017 |
205-v1 |
Analysis of long pulse data in MEBT |
Alexander Shemyakin |
MEBT
|
07 Mar 2017 |
161-v1 |
MEBT Emittance Scanner Calibration |
Lionel R. Prost |
MEBT
Technical Meeting
Instrumentation
|
14 Feb 2017 |
157-v1 |
LINAC 16 Presentation: PIP2IT Status |
Paul Derwent |
IS
MEBT
Front End
LEBT
RFQ
|
07 Feb 2017 |
135-v3 |
The 200 Ohm Kicker Protection Electrodes Beam Signals Levels Estimation |
Daniil Frolov et al. |
MEBT
Instrumentation
|
09 Jan 2017 |
134-v1 |
Estimation of dilution of a Fast Faraday Cup response due to the finite particles speed |
Alexander Shemyakin |
MEBT
Instrumentation
|
21 Dec 2016 |
133-v1 |
Summary of running in a high-power short MEBT configuration |
Alexander Shemyakin |
MEBT
|
13 Dec 2016 |
102-v2 |
Beam Size along the Pulse in PIP-II IT MEBT |
Ihar Lobach |
MEBT
|
12 Aug 2016 |
96-v3 |
PIP-II Injector Tests mode of operation in FY17 |
Alexander Shemyakin |
MEBT
ES&H
|
15 Jul 2016 |
95-v1 |
Optics Measuremetn at MEBT 1.1 |
Arun Saini et al. |
MEBT
Technical Meeting
Lattice Optics
|
14 Jul 2016 |
94-v1 |
Software for optics measurements |
Arun Saini et al. |
MEBT
Software & Computing
Lattice Optics
|
14 Jul 2016 |
35-v1 |
Plan for MEBT measurements in FY16 |
Alexander Shemyakin |
MEBT
Technical Meeting
|
27 Oct 2015 |
33-v1 |
PXIE MEBT Buncher Cavity Prototype Commissioning Report |
Leonard Ristori et al. |
MEBT
Technical Reports
|
23 Oct 2015 |
18-v2 |
Prototype MEBT Buncher Cavity Test |
Vic E. Scarpine et al. |
MEBT
Front End
Technical Meeting
|
20 Aug 2015 |