PIP-II-doc-# Title Author(s) Topic(s) Last Updated
5090-v2 Beam position jitter in the PIP2IT MEBT Alexander Shemyakin Front End
04 Nov 2020
71-v1 PXIE LEBT Chopper Driver Manual Greg Saewert LEBT
Instrumentation
03 Mar 2016
5-v0 PXIE RFQ installation plan Curtis Baffes RFQ
30 Jun 2015
593-v0 PIP2IT MEBT Absorber Status Update Curtis Baffes MEBT
13 Jun 2017
51-v1 UNCONTROLLED AND FOR REFERENCE ONLY - Top level PXIE drawings Curtis Baffes Front End
23 Dec 2015
4978-v1 Beam at PIP2IT: status and plans Alexander Shemyakin Front End
Beam Transport
Beam Commissioning
09 Sep 2020
4968-v1 Suggestion for the beam jitter analysis procedure Alexander Shemyakin Front End
26 Aug 2020
3406-v1 HESSS radiation map Alexander Shemyakin Front End
Instrumentation
23 Jul 2019
3400-v1 Notes on specifications for HEBT Emittance Slit-Slit Scanner (HESSS) Alexander Shemyakin Front End
Instrumentation
23 Jul 2019
1642-v3 Procedure for finding an aperture restriction in a beam line Alexander Shemyakin Front End
Technical Meeting
26 Nov 2018
2187-v3 Analysis of BPM harmonics at PIP2IT MEBT Alexander Shemyakin MEBT
Technical Meeting
Instrumentation
23 Oct 2018
1582-v6 PIP-II FDR MEBT kicker review Alex Chen et al. MEBT
Internal Reviews
Front End
22 Oct 2018
1704-v3 Effect of image charges on differential trajectories measurements Alexander Shemyakin MEBT
Lattice Optics
09 Oct 2018
1654-v2 Characterization of 2.1 MeV H- Beam using Action-Phase Coordinates Chris J Richard et al. MEBT
Instrumentation
Technical Meeting
28 Aug 2018
1648-v1 Proposal for the High Energy Beam Transport (HEBT) design Alexander Shemyakin Front End
Technical Meeting
28 Aug 2018
1612-v1 Summary of PIP2IT Spring’18 run Alexander Shemyakin Front End
Technical Meeting
13 Aug 2018
1594-v1 Proposal to use integration of current losses in PIP2IT MPS Alexander Shemyakin MEBT
Front End
Controls
31 Jul 2018
1554-v1 PIP-II RFQ Module 2 Braze Assembly Andrew Lambert PIP-II Collaboration
RFQ
19 Jul 2018
1509-v1 FFC Measurements at PIP-II Injector Test and corresponding Tracewin simulations Jean-Paul Carneiro MEBT
Technical Meeting
05 Jun 2018
1365-v2 Update on PIP2IT warm front end Alexander Shemyakin Front End
Technical Meeting
06 Feb 2018
1347-v1 PIP2IT MEBT 50-Ohm kicker deflection characterization Lionel R. Prost MEBT
Technical Meeting
30 Jan 2018
1278-v2 Update on PIP2IT warm front end Alexander Shemyakin MEBT
Front End
06 Dec 2017
1206-v1 Update on 200 Ohm kicker driver performance Daniil Frolov et al. MEBT
Front End
PIP-II Collaboration
Technical Meeting
Instrumentation
31 Oct 2017
1203-v1 Update on beam measurements with the 200 Ohm kicker Alexander Shemyakin MEBT
31 Oct 2017
1158-v2 PIP2IT Design Handbook Paul Derwent MEBT
Front End
LEBT
DR
Technical Reports
IS
RFQ
27 Sep 2017
1013-v3 200 Ohm Chopper Progress Update Daniil Frolov et al. MEBT
PXIE: IS/LEBT
Publications
26 Jul 2017
1007-v1 Measurements of bunch-by-bunch kicking with 200 Ohm kicker Alexander Shemyakin MEBT
Technical Meeting
25 Jul 2017
896-v2 Update on PIP2IT warm front end Alexander Shemyakin Front End
Technical Meeting
19 Jul 2017
546-v1 Protection Electrode Signal Processing Algorithm Daniil Frolov et al. MEBT
PIP-II Collaboration
Instrumentation
09 May 2017
339-v1 Update on PIP2IT warm front end status Alexander Shemyakin Front End
03 Apr 2017
277-v1 Temporary High Energy Beam Transport line, HEBT-0 Alexander Shemyakin Front End
14 Mar 2017
271-v1 PIP2IT HEBT-0 FRS Alexander Shemyakin Front End
TRS
13 Mar 2017
223-v1 PIP2IT MEBT Kicker Protection Electrode Electronics FRS Daniil Frolov et al. MEBT
FRS
13 Mar 2017
205-v1 Analysis of long pulse data in MEBT Alexander Shemyakin MEBT
07 Mar 2017
161-v1 MEBT Emittance Scanner Calibration Lionel R. Prost MEBT
Technical Meeting
Instrumentation
14 Feb 2017
157-v1 LINAC 16 Presentation: PIP2IT Status Paul Derwent MEBT
Front End
LEBT
IS
RFQ
07 Feb 2017
149-v3 Next steps with PIP2IT front end Alexander Shemyakin Front End
Technical Meeting
25 Jan 2017
135-v3 The 200 Ohm Kicker Protection Electrodes Beam Signals Levels Estimation Daniil Frolov et al. MEBT
Instrumentation
09 Jan 2017
134-v1 Estimation of dilution of a Fast Faraday Cup response due to the finite particles speed Alexander Shemyakin MEBT
Instrumentation
21 Dec 2016
133-v1 Summary of running in a “high-power” short MEBT configuration Alexander Shemyakin MEBT
13 Dec 2016
125-v1 Status of the warm front end of PIP-II Injector Test Alexander Shemyakin Front End
Technical Meeting
08 Nov 2016
117-v1 RFQ couplers update Sergey Kazakov RFQ
24 Oct 2016
102-v2 Beam Size along the Pulse in PIP-II IT MEBT Ihar Lobach MEBT
12 Aug 2016
100-v1 PIP-II Injector Test LEBT Operation for the RFQ Jean-Paul Carneiro et al. LEBT
Lattice Optics
Technical Meeting
26 Jul 2016
96-v3 PIP-II Injector Test’s mode of operation in FY17 Alexander Shemyakin MEBT
ES&H
15 Jul 2016
95-v1 Optics Measuremetn at MEBT 1.1 Arun Saini et al. MEBT
Lattice Optics
Technical Meeting
14 Jul 2016
94-v1 Software for optics measurements Arun Saini et al. MEBT
Software & Computing
Lattice Optics
14 Jul 2016
91-v2 Status of the warm front end of PIP-II Injector Test (PXIE) Alexander Shemyakin Front End
21 Jun 2016
85-v1 PXIE warm front end status Alexander Shemyakin Front End
03 May 2016
83-v1 Analysis of the vacuum failure at PXIE on April 10, 2016 Alex Chen et al. Front End
28 Apr 2016
77-v2 Update on PXIE front end status Alexander Shemyakin Front End
29 Mar 2016
72-v1 Initial Analysis of PXIE RFQ X-ray Measurements Vic E. Scarpine RFQ
04 Mar 2016
61-v1 PXIE LEBT status update Lionel R. Prost Front End
LEBT
IS
Technical Meeting
09 Feb 2016
41-v3 Update of PXIE FRS Alexander Shemyakin Front End
Technical Meeting
24 Nov 2015
36-v1 PXIE LEBT Status and Startup Plan Lionel R. Prost LEBT
IS
Technical Meeting
27 Oct 2015
35-v1 Plan for MEBT measurements in FY16 Alexander Shemyakin MEBT
Technical Meeting
27 Oct 2015
33-v1 PXIE MEBT Buncher Cavity Prototype Commissioning Report Leonard Ristori et al. MEBT
Technical Reports
23 Oct 2015
27-v1 H- Ion Source back plate cleaning HA Lionel R. Prost IS
ES&H
29 Sep 2015
22-v1 Proposal for testing HWR cryomodule with a beam (PXIE-10MeV) Alexander Shemyakin Front End
Technical Meeting
04 Sep 2015
18-v2 Prototype MEBT Buncher Cavity Test Vic E. Scarpine et al. MEBT
Front End
Technical Meeting
20 Aug 2015
12-v1 RFQ resonance control system update Auralee Edelen et al. Front End
SC Linac
All Meetings List
Technical Meeting
RFQ
04 Aug 2015
13-v1 PXIE LEBT Commissioning Update Lionel R. Prost LEBT
Technical Meeting
04 Aug 2015
10-v1 RFQ coupler Sergey Kazakov SC Linac
All Meetings List
Technical Meeting
RFQ
28 Jul 2015
9-v1 RFQ Electrical Installation and Conditioning Vic E. Scarpine et al. RFQ
21 Jul 2015

Number of documents found: 64

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Users in Groups ] [ List Authors ] [ List Events ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact Service Desk



DocDB Version 8.8.10, contact Document Database Administrators
Execution time: 1 wallclock secs ( 0.30 usr + 0.07 sys = 0.37 CPU)