PIP-II


Document List by Topic

These documents on SC Linac and sub-topics are available:
Showing documents with topic SC Linac on the most recent version. See documents with SC Linac on any version.

PIP-II-doc-# Title Author(s) Topic(s) Last Updated
4950-v3 PIP2IT Machine Protection System and Mode Controller Technical Requirements Specification Alexander Shemyakin SC Linac
TRS
17 Sep 2020
4978-v1 Beam at PIP2IT: status and plans Alexander Shemyakin Front End
Beam Transport
Beam Commissioning
09 Sep 2020
4872-v2 Interface between PIP2IT Control Room and the Main Control Room Darren Crawford Beam Transport
Beam Commissioning
01 Sep 2020
4968-v1 Suggestion for the beam jitter analysis procedure Alexander Shemyakin Front End
26 Aug 2020
4947-v1 Limitations on the PIP2IT beam loss Alexander Shemyakin SC Linac
24 Aug 2020
4853-v1 PIP2IT Fast Faraday Cup Alexander Shemyakin Instrumentation
29 Jun 2020
4259-v1 PIP-II RF Amplifier MTBF Jeremiah P. Holzbauer et al. RF Sources
22 Dec 2019
4039-v1 HWR Lid Lift/Removal Documentation Zack Conway et al. HWR
05 Sep 2019
3406-v1 HESSS radiation map Alexander Shemyakin Front End
Instrumentation
23 Jul 2019
3400-v1 Notes on specifications for HEBT Emittance Slit-Slit Scanner (HESSS) Alexander Shemyakin Front End
Instrumentation
23 Jul 2019
3024-v1 MPS-related devices at PIP2IT in its final configuration and suggestion for Mode Control program Alexander Shemyakin Controls
26 Apr 2019
2991-v2 The Possibility to Mitigate LFD Problem in PIP II Pulsed Operation Regime Vyacheslav Yakovlev et al. SC Linac
Project Management
21 Mar 2019
2536-v1 Status of prototype SSR1 cryomodule for PIP-II Donato Passarelli SC Linac
SSR
SC Cavities & Cryomodules
28 Nov 2018
2530-v1 PIP-II 650 MHz Cryomodule Design and Transportation Vincent Roger SC Linac
LB650
SSR
SC Cavities & Cryomodules
HB650
27 Nov 2018
1642-v3 Procedure for finding an aperture restriction in a beam line Alexander Shemyakin Front End
Technical Meeting
26 Nov 2018
2285-v1 Proposal to add permanent diagnostics lines to PIP-II linac design Alexander Shemyakin Beam Commissioning
Instrumentation
13 Nov 2018
2267-v1 Controls Modernization Workshop Recap Dennis Nicklaus Controls
Technical Meeting
Software & Computing
06 Nov 2018
2255-v1 Preparations for Cryomodule Installation at PIP2IT Curtis Baffes SC Linac
SSR
HWR
05 Nov 2018
2187-v3 Analysis of BPM harmonics at PIP2IT MEBT Alexander Shemyakin MEBT
Technical Meeting
Instrumentation
23 Oct 2018
1582-v6 PIP-II FDR MEBT kicker review Alex Chen et al. MEBT
Front End
Internal Reviews
22 Oct 2018
2160-v2 PIP2IT beam running plan for early 2019 Fernanda G. Garcia et al. IS
MEBT
Front End
Technical Meeting
LEBT
Instrumentation
RFQ
09 Oct 2018
1704-v3 Effect of image charges on differential trajectories measurements Alexander Shemyakin MEBT
Lattice Optics
09 Oct 2018
1710-v1 HWR Status and Plans for Completion Joe Ozelis Technical Meeting
HWR
02 Oct 2018
1654-v2 Characterization of 2.1 MeV H- Beam using Action-Phase Coordinates Chris J Richard et al. Instrumentation
MEBT
Technical Meeting
28 Aug 2018
1648-v1 Proposal for the High Energy Beam Transport (HEBT) design Alexander Shemyakin Front End
Technical Meeting
28 Aug 2018
1612-v1 Summary of PIP2IT Spring’18 run Alexander Shemyakin Front End
Technical Meeting
13 Aug 2018
1594-v1 Proposal to use integration of current losses in PIP2IT MPS Alexander Shemyakin Controls
MEBT
Front End
31 Jul 2018
1554-v1 PIP-II RFQ Module 2 Braze Assembly Andrew Lambert PIP-II Collaboration
RFQ
19 Jul 2018
1527-v1 650 MHz couplers for PIP-II Sergey Kazakov SC Cavities & Cryomodules
22 Jun 2018
1509-v1 FFC Measurements at PIP-II Injector Test and corresponding Tracewin simulations Jean-Paul Carneiro MEBT
Technical Meeting
05 Jun 2018
113-v10 PIP-II Conceptual Design Report Valeri A. Lebedev Rings
SC Linac
PIP-II Collaboration
Software & Computing
04 Jun 2018
1436-v1 Voltage and Phase Stabilization in SC Cavities Valeri A. Lebedev LLRF
19 Mar 2018
1365-v2 Update on PIP2IT warm front end Alexander Shemyakin Front End
Technical Meeting
06 Feb 2018
1359-v1 Status of couplers for PIP-II. Sergey Kazakov Technical Meeting
SC Cavities & Cryomodules
02 Feb 2018
1347-v1 PIP2IT MEBT 50-Ohm kicker deflection characterization Lionel R. Prost MEBT
Technical Meeting
30 Jan 2018
1323-v1 Update of PIP2IT Beam Instrumentation Vic E. Scarpine Instrumentation
16 Jan 2018
71-v2 PXIE LEBT Chopper Driver Manual Greg Saewert Instrumentation
LEBT
10 Jan 2018
1278-v2 Update on PIP2IT warm front end Alexander Shemyakin MEBT
Front End
06 Dec 2017
1284-v4 Progress with SSR1, SSR2 cavities and cryomodule Donato Passarelli Technical Meeting
SSR
05 Dec 2017
1227-v1 Nov 28, 2017 Update on PIP2IT amplifiers David Peterson Technical Meeting
RF Sources
28 Nov 2017
1192-v2 EM & Mechanical Design of LB 650 MHz Cavities Ivan Gonin et al. LB650
31 Oct 2017
1206-v1 Update on 200 Ohm kicker driver performance Daniil Frolov et al. MEBT
Front End
PIP-II Collaboration
Technical Meeting
Instrumentation
31 Oct 2017
1203-v1 Update on beam measurements with the 200 Ohm kicker Alexander Shemyakin MEBT
31 Oct 2017
1182-v1 Resonance Control of LB650MHz and HB650MHz SRF Cavities Yuriy M. Pischalnikov SC Linac
06 Oct 2017
1158-v2 PIP2IT Design Handbook Paul Derwent IS
MEBT
Front End
LEBT
DR
Technical Reports
RFQ
27 Sep 2017
1145-v1 Status of LB650MHz and HB650MHz SRF Cavities Tuner Yuriy M. Pischalnikov SC Linac
LLRF
20 Sep 2017
1100-v2 Transit Time Factor of a Multi-cell Standing Wave Cavity Jean-Francois Ostiguy SC Cavities & Cryomodules
13 Sep 2017
1112-v1 Beam current measurements with resistive wall monitor Valeri A. Lebedev Technical Meeting
Instrumentation
12 Sep 2017
1094-v1 PIP2IT Ion Source Stability Study Bruce Hanna et al. IS
Front End
Technical Meeting
30 Aug 2017
1088-v1 Status of SSR1 cryomodules Donato Passarelli Technical Meeting
SSR
28 Aug 2017
1076-v1 PIP-II cryomodule update and future testing plans Valeri A. Lebedev HWR
22 Aug 2017
1013-v3 200 Ohm Chopper Progress Update Daniil Frolov et al. PXIE: IS/LEBT
Publications
MEBT
26 Jul 2017
1007-v1 Measurements of bunch-by-bunch kicking with 200 Ohm kicker Alexander Shemyakin MEBT
Technical Meeting
25 Jul 2017
896-v2 Update on PIP2IT warm front end Alexander Shemyakin Front End
Technical Meeting
19 Jul 2017
51-v2 UNCONTROLLED AND FOR REFERENCE ONLY - Top level PIP2IT drawings Curtis Baffes Front End
14 Jun 2017
593-v1 PIP2IT MEBT Absorber Status Update Curtis Baffes MEBT
13 Jun 2017
546-v1 Protection Electrode Signal Processing Algorithm Daniil Frolov et al. Instrumentation
MEBT
PIP-II Collaboration
09 May 2017
462-v1 Status of the HWR Cryomodule Production Andrei Lunin PIP-II Collaboration
HWR
25 Apr 2017
339-v1 Update on PIP2IT warm front end status Alexander Shemyakin Front End
03 Apr 2017
283-v2 Beam Current Measurements in the MPS Valeri A. Lebedev Instrumentation
15 Mar 2017
277-v1 Temporary High Energy Beam Transport line, HEBT-0 Alexander Shemyakin Front End
14 Mar 2017
271-v1 PIP2IT HEBT-0 FRS Alexander Shemyakin Front End
TRS
13 Mar 2017
223-v1 PIP2IT MEBT Kicker Protection Electrode Electronics FRS Daniil Frolov et al. FRS
MEBT
13 Mar 2017
205-v1 Analysis of long pulse data in MEBT Alexander Shemyakin MEBT
07 Mar 2017
161-v1 MEBT Emittance Scanner Calibration Lionel R. Prost MEBT
Technical Meeting
Instrumentation
14 Feb 2017
157-v1 LINAC 16 Presentation: PIP2IT Status Paul Derwent IS
MEBT
Front End
LEBT
RFQ
07 Feb 2017
149-v3 Next steps with PIP2IT front end Alexander Shemyakin Front End
Technical Meeting
25 Jan 2017
154-v1 PIP2IT MEBT Scanner Update Vic E. Scarpine Instrumentation
25 Jan 2017
153-v1 pCM test: Preliminary results Nikolay A. Solyak SC Linac
SC Cavities & Cryomodules
18 Jan 2017
135-v3 The 200 Ohm Kicker Protection Electrodes Beam Signals Levels Estimation Daniil Frolov et al. Instrumentation
MEBT
09 Jan 2017
134-v1 Estimation of dilution of a Fast Faraday Cup response due to the finite particles speed Alexander Shemyakin MEBT
Instrumentation
21 Dec 2016
133-v1 Summary of running in a “high-power” short MEBT configuration Alexander Shemyakin MEBT
13 Dec 2016
126-v1 Reliability of PIP-II SRF tuners Yuriy M. Pischalnikov Controls
22 Nov 2016
125-v1 Status of the warm front end of PIP-II Injector Test Alexander Shemyakin Front End
Technical Meeting
08 Nov 2016
124-v1 Update on Laser Diagnostics Vic E. Scarpine Instrumentation
01 Nov 2016
1-v1 The PIP-II Reference Design Report Valeri A. Lebedev SC Linac
27 Oct 2016
117-v1 RFQ couplers update Sergey Kazakov RFQ
24 Oct 2016
109-v1 Charaterization of the MEBT Bunching Cavity Jim Steimel MEBT
13 Sep 2016
103-v1 Dark Current in PIP2 SRF Linac Alexander Sukhanov Technical Meeting
SC Cavities & Cryomodules
31 Aug 2016
102-v2 Beam Size along the Pulse in PIP-II IT MEBT Ihar Lobach MEBT
12 Aug 2016
100-v1 PIP-II Injector Test LEBT Operation for the RFQ Jean-Paul Carneiro et al. Technical Meeting
LEBT
Lattice Optics
26 Jul 2016
98-v1 Update on couplers for SC resonators Sergey Kazakov SC Linac
19 Jul 2016
96-v3 PIP-II Injector Test’s mode of operation in FY17 Alexander Shemyakin MEBT
ES&H
15 Jul 2016
95-v1 Optics Measuremetn at MEBT 1.1 Arun Saini et al. MEBT
Technical Meeting
Lattice Optics
14 Jul 2016
94-v1 Software for optics measurements Arun Saini et al. MEBT
Lattice Optics
Software & Computing
14 Jul 2016
91-v2 Status of the warm front end of PIP-II Injector Test (PXIE) Alexander Shemyakin Front End
21 Jun 2016
90-v1 Proposed Power Supplies for Cryogenic Magnets for PIP II Bruce Hanna SSR
HWR
21 Jun 2016
85-v1 PXIE warm front end status Alexander Shemyakin Front End
03 May 2016
83-v1 Analysis of the vacuum failure at PXIE on April 10, 2016 Alex Chen et al. Front End
28 Apr 2016
81-v3 BPMs for the PIP-II linac Valeri A. Lebedev Instrumentation
Instrumentation
13 Apr 2016
82-v1 LB650 Cavity RF design upgrade Timergali Khabiboulline LB650
HB650
13 Apr 2016
77-v2 Update on PXIE front end status Alexander Shemyakin Front End
29 Mar 2016
72-v1 Initial Analysis of PXIE RFQ X-ray Measurements Vic E. Scarpine RFQ
04 Mar 2016
65-v1 PIP-II SRF Linac: Challenges, Issues and Status Vyacheslav Yakovlev SC Linac
Technical Meeting
17 Feb 2016
63-v1 PXIE Beam Instrumentation Status Update Vic E. Scarpine Instrumentation
09 Feb 2016
62-v1 PXIE RFQ Commissioning Status Jim Steimel Technical Meeting
RFQ
09 Feb 2016
61-v1 PXIE LEBT status update Lionel R. Prost IS
Front End
Technical Meeting
LEBT
09 Feb 2016
59-v1 Requirements to PIP-II Alignment Valeri A. Lebedev SC Linac
Beam Transport
03 Feb 2016
58-v2 Draft for PIP-II Machine Protection System (MPS) FRS Alexander Shemyakin SC Linac
Technical Meeting
02 Feb 2016
57-v1 Multipacting with space charge effect in PIP-II 650 MHz cavities Gennady Romanov LB650
HB650
28 Jan 2016
56-v1 SSR1 interface control document status update Curtis Baffes et al. SSR
26 Jan 2016
50-v1 PXIE Functional Requirements Specification Curtis Baffes et al. FRS
SC Linac
23 Dec 2015
46-v1 PIP-II MPS meeting Alexander Shemyakin FRS
SC Linac
All Meetings List
16 Dec 2015
47-v1 SSR1 Interface Control Document - Call for Assistance Donald Mitchell SSR
15 Dec 2015
44-v1 RFQ Installation Status Jim Steimel Technical Meeting
RFQ
24 Nov 2015
41-v3 Update of PXIE FRS Alexander Shemyakin Front End
Technical Meeting
24 Nov 2015
37-v1 PXIE RFQ Installation Status Jim Steimel Technical Meeting
RFQ
27 Oct 2015
36-v1 PXIE LEBT Status and Startup Plan Lionel R. Prost IS
Technical Meeting
LEBT
27 Oct 2015
35-v1 Plan for MEBT measurements in FY16 Alexander Shemyakin MEBT
Technical Meeting
27 Oct 2015
33-v1 PXIE MEBT Buncher Cavity Prototype Commissioning Report Leonard Ristori et al. MEBT
Technical Reports
23 Oct 2015
30-v1 Best practices for minimizing vibration sources in ancillary systems - talk for microphonics workshop Curtis Baffes Microphonics & LFD
06 Oct 2015
28-v1 RFQ Installation Status Curtis Baffes et al. Front End
RFQ
29 Sep 2015
27-v1 H- Ion Source back plate cleaning HA Lionel R. Prost IS
ES&H
29 Sep 2015
24-v1 PIP-II / PXIE MPS meeting Alexander Shemyakin et al. Controls
16 Sep 2015
22-v1 Proposal for testing HWR cryomodule with a beam (PXIE-10MeV) Alexander Shemyakin Front End
Technical Meeting
04 Sep 2015
18-v2 Prototype MEBT Buncher Cavity Test Vic E. Scarpine et al. MEBT
Front End
Technical Meeting
20 Aug 2015
12-v1 RFQ resonance control system update Auralee Edelen et al. Front End
SC Linac
Technical Meeting
All Meetings List
RFQ
04 Aug 2015
13-v1 PXIE LEBT Commissioning Update Lionel R. Prost Technical Meeting
LEBT
04 Aug 2015
10-v1 RFQ coupler Sergey Kazakov SC Linac
Technical Meeting
All Meetings List
RFQ
28 Jul 2015
9-v1 RFQ Electrical Installation and Conditioning Vic E. Scarpine et al. RFQ
21 Jul 2015
8-v1 High Level RF for PXIE Ralph Pasquinelli RF Sources
15 Jul 2015
5-v1 PXIE RFQ installation plan Curtis Baffes Front End
Technical Meeting
All Meetings List
RFQ
14 Jul 2015
6-v1 PXIE RFQ Mechanical Construction Status Jim Steimel Technical Meeting
All Meetings List
RFQ
08 Jul 2015

Number of documents found: 123

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Users in Groups ] [ List Authors ] [ List Events ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact Service Desk



DocDB Version 8.8.9, contact Document Database Administrators
Execution time: 2 wallclock secs ( 0.43 usr + 0.16 sys = 0.59 CPU)