2536-v1 Status of prototype SSR1 cryomodule for PIP-II (13 Nov 2018)
Donato Passarelli 28 Nov 2018
2530-v1 PIP-II 650 MHz Cryomodule Design and Transportation (13 Nov 2018)
Vincent Roger 27 Nov 2018
4414-v3 PIP-II Risk MC Model (PRA file) (06 Nov 2018)
Lucas Taylor 13 Oct 2020
2267-v1 Controls Modernization Workshop Recap (06 Nov 2018)
Dennis Nicklaus 06 Nov 2018
2255-v1 Preparations for Cryomodule Installation at PIP2IT (06 Nov 2018)
Curtis Baffes 05 Nov 2018
2249-v1 PIP-II Beam Instrumentation Update (30 Oct 2018)
Vic E. Scarpine 06 Nov 2018
2187-v3 Analysis of BPM harmonics at PIP2IT MEBT (23 Oct 2018)
Alexander Shemyakin 23 Oct 2018
2193-v1 A Code for Longitudinal Dynamics in Synchrotrons, (16 Oct 2018)
Jean-Francois Ostiguy 16 Oct 2018
2160-v2 PIP2IT beam running plan for early 2019 (09 Oct 2018)
Fernanda G. Garcia et al. 09 Oct 2018
1710-v1 HWR Status and Plans for Completion (02 Oct 2018)
Joe Ozelis 02 Oct 2018
1678-v1 Reliability of PIP2IT Warm Front End (18 Sep 2018)
Bruce Hanna 18 Sep 2018
1654-v2 Characterization of 2.1 MeV H- Beam using Action-Phase Coordinates (28 Aug 2018)
Chris J Richard et al. 28 Aug 2018
1648-v1 Proposal for the High Energy Beam Transport (HEBT) design (28 Aug 2018)
Alexander Shemyakin 28 Aug 2018
1618-v1 PIP-II Cryomodule Development (14 Aug 2018)
Genfa Wu 17 Aug 2018
1612-v1 Summary of PIP2IT Spring’18 run (14 Aug 2018)
Alexander Shemyakin 13 Aug 2018
1567-v1 Extinction measurement in MEBT (24 Jul 2018)
Daniil Frolov 30 Jul 2018
1505-v1 SSR1 Current Test Results (15 May 2018)
Alexander Sukhanov 15 May 2018
1502-v1 PIP2IT Cryogenics Distribution System (15 May 2018)
Renzhuo Wang 15 May 2018
1588-v1 PIP-II Beam Transfers to Booster (24 Apr 2018)
Brian E Chase 31 Jul 2018
1454-v3 Optics Measurement at MEBT 3 (03 Apr 2018)
Arun Saini 03 Apr 2018
1448-v2 PIP-II Project Status (20 Mar 2018)
Steve Holmes 20 Mar 2018
1436-v1 Voltage and Phase Stabilization in SC Cavities (20 Mar 2018)
Valeri A. Lebedev 19 Mar 2018
1442-v2 Update on Q0 studies and material issues for PIP II SC cavities (13 Mar 2018)
Saravan K. Chandrasekaran 21 Mar 2018
1430-v2 Booster Injection Girder for PIP-II (13 Mar 2018)
David E. Johnson 10 Oct 2018
1418-v1 MPS Status (27 Feb 2018)
Arden Warner 27 Feb 2018
1365-v2 Update on PIP2IT warm front end (06 Feb 2018)
Alexander Shemyakin 06 Feb 2018
1347-v1 PIP2IT MEBT 50-Ohm kicker deflection characterization (30 Jan 2018)
Lionel R. Prost 30 Jan 2018
1359-v1 Status of couplers for PIP-II. (30 Jan 2018)
Sergey Kazakov 02 Feb 2018
1320-v2 High Power (CW) Test of 50 Ohm Fast Kicker (16 Jan 2018)
Ding Sun 16 Jan 2018
1323-v1 Update of PIP2IT Beam Instrumentation (16 Jan 2018)
Vic E. Scarpine 16 Jan 2018
1227-v1 Nov 28, 2017 Update on PIP2IT amplifiers (28 Nov 2017)
David Peterson 28 Nov 2017
1206-v1 Update on 200 Ohm kicker driver performance (31 Oct 2017)
Daniil Frolov et al. 31 Oct 2017
1203-v1 Update on beam measurements with the 200 Ohm kicker (31 Oct 2017)
Alexander Shemyakin 31 Oct 2017
1192-v2 EM & Mechanical Design of LB 650 MHz Cavities (24 Oct 2017)
Ivan Gonin et al. 31 Oct 2017
1169-v1 Update on PIP2IT: beam through MEBT-3.0 (03 Oct 2017)
Alexander Shemyakin 02 Oct 2017
1145-v1 Status of LB650MHz and HB650MHz SRF Cavities Tuner (19 Sep 2017)
Yuriy M. Pischalnikov 20 Sep 2017
1112-v1 Beam current measurements with resistive wall monitor (12 Sep 2017)
Valeri A. Lebedev 12 Sep 2017
1106-v1 Beam Jitter in the PIP2IT MEBT (12 Sep 2017)
Alexander Shemyakin et al. 13 Sep 2017
1088-v1 Status of SSR1 cryomodules (22 Aug 2017)
Donato Passarelli 28 Aug 2017
1082-v1 HWR Cryomodule Update and Future Testing Plans (22 Aug 2017)
Zack Conway 24 Aug 2017
462-v1 Status of the HWR Cryomodule Production (25 Apr 2017)
Andrei Lunin 25 Apr 2017
339-v1 Update on PIP2IT warm front end status (04 Apr 2017)
Alexander Shemyakin 03 Apr 2017
312-v1 LCLS-II CMs assembly at Fermilab (21 Mar 2017)
Tug T. Arkan 22 Mar 2017
289-v2 HEBT-0 Beam Dump MARS Simulations Summary (21 Mar 2017)
Anthony Leveling et al. 22 Mar 2017
277-v1 Temporary High Energy Beam Transport line, HEBT-0 (14 Mar 2017)
Alexander Shemyakin 14 Mar 2017
199-v1 Emittance dilution due to beam motion (07 Mar 2017)
Alexander Shemyakin et al. 07 Mar 2017
205-v1 Analysis of long pulse data in MEBT (07 Mar 2017)
Alexander Shemyakin 07 Mar 2017
178-v1 Emittance Measurements in MEBT-13 (28 Feb 2017)
Jean-Paul Carneiro 28 Feb 2017
161-v1 MEBT Emittance Scanner Calibration (28 Feb 2017)
(21 Feb 2017)
Lionel R. Prost 14 Feb 2017
154-v1 PIP2IT MEBT Scanner Update (24 Jan 2017)
Vic E. Scarpine 25 Jan 2017
149-v3 Next steps with PIP2IT front end (17 Jan 2017)
(24 Jan 2017)
Alexander Shemyakin 25 Jan 2017
153-v1 pCM test: Preliminary results (17 Jan 2017)
Nikolay A. Solyak 18 Jan 2017
133-v1 Summary of running in a “high-power” short MEBT configuration (13 Dec 2016)
Alexander Shemyakin 13 Dec 2016
129-v1 PIP2IT CDS (22 Nov 2016)
Renzhuo Wang 22 Nov 2016
128-v1 Beam Dynamics inPIP2 Linac with 10 mA (08 Nov 2016)
Alexander Sukhanov 22 Nov 2016
125-v1 Status of the warm front end of PIP-II Injector Test (08 Nov 2016)
Alexander Shemyakin 08 Nov 2016
117-v1 RFQ couplers update (18 Oct 2016)
Sergey Kazakov 24 Oct 2016
124-v1 Update on Laser Diagnostics (27 Sep 2016)
Vic E. Scarpine 01 Nov 2016
108-v1 Limitations and possible improvements of the Booster two-stage collimation (13 Sep 2016)
Valeri A. Lebedev 12 Sep 2016
109-v1 Charaterization of the MEBT Bunching Cavity (13 Sep 2016)
Jim Steimel 13 Sep 2016
105-v1 Radiation simulations of the MEBT dump (06 Sep 2016)
Anthony Leveling et al. 11 Feb 2019
106-v1 Update on beam energy measurement of PI Test RFQ (06 Sep 2016)
Vyaghri Sista 18 Sep 2017
104-v1 RFQ resonance control update: Control framework and initial results (30 Aug 2016)
Daniel Bowring et al. 31 Aug 2016
103-v1 Dark Current in PIP2 SRF Linac (23 Aug 2016)
Alexander Sukhanov 31 Aug 2016
100-v1 PIP-II Injector Test LEBT Operation for the RFQ (26 Jul 2016)
Jean-Paul Carneiro et al. 26 Jul 2016
98-v1 Update on couplers for SC resonators (19 Jul 2016)
Sergey Kazakov 19 Jul 2016
95-v1 Optics Measuremetn at MEBT 1.1 (12 Jul 2016)
Arun Saini et al. 14 Jul 2016
94-v1 Software for optics measurements (12 Jul 2016)
Arun Saini et al. 14 Jul 2016
92-v1 RFQ Resonance Update (05 Jul 2016)
Jim Steimel 05 Jul 2016
91-v2 Status of the warm front end of PIP-II Injector Test (PXIE) (21 Jun 2016)
Alexander Shemyakin 21 Jun 2016
90-v1 Proposed Power Supplies for Cryogenic Magnets for PIP II (21 Jun 2016)
Bruce Hanna 21 Jun 2016
87-v1 Current Status of PIP-II Resonance Control (17 May 2016)
(14 Jun 2016)
Warren Schappert 02 Jun 2016
88-v1 PXIE Beam Instrumentation Status Update (07 Jun 2016)
Vic E. Scarpine 07 Jun 2016
85-v1 PXIE warm front end status (03 May 2016)
Alexander Shemyakin 03 May 2016
81-v3 BPMs for the PIP-II linac (12 Apr 2016)
Valeri A. Lebedev 13 Apr 2016
77-v2 Update on PXIE front end status (29 Mar 2016)
Alexander Shemyakin 29 Mar 2016
76-v1 Focusing Solenoids for HINS LinacFront End and PXIE Test Stand:Alignment Studies (22 Mar 2016)
Iouri Terechkine 23 Mar 2016
65-v1 PIP-II SRF Linac: Challenges, Issues and Status (16 Feb 2016)
Vyacheslav Yakovlev 17 Feb 2016
64-v3 Power Supplies for PXIE Cryomodules (16 Feb 2016)
Valeri A. Lebedev 19 Apr 2016
61-v1 PXIE LEBT status update (09 Feb 2016)
Lionel R. Prost 09 Feb 2016
63-v1 PXIE Beam Instrumentation Status Update (09 Feb 2016)
Vic E. Scarpine 09 Feb 2016
62-v1 PXIE RFQ Commissioning Status (09 Feb 2016)
Jim Steimel 09 Feb 2016
58-v2 Draft for PIP-II Machine Protection System (MPS) FRS (02 Feb 2016)
Alexander Shemyakin 02 Feb 2016
56-v1 SSR1 interface control document status update (26 Jan 2016)
Curtis Baffes et al. 26 Jan 2016
57-v1 Multipacting with space charge effect in PIP-II 650 MHz cavities (26 Jan 2016)
Gennady Romanov 28 Jan 2016
52-v1 CDR write-up (12 Jan 2016)
Valeri A. Lebedev 12 Jan 2016
44-v1 RFQ Installation Status (24 Nov 2015)
Jim Steimel 24 Nov 2015
41-v3 Update of PXIE FRS (24 Nov 2015)
Alexander Shemyakin 24 Nov 2015
37-v1 PXIE RFQ Installation Status (27 Oct 2015)
Jim Steimel 27 Oct 2015
36-v1 PXIE LEBT Status and Startup Plan (27 Oct 2015)
Lionel R. Prost 27 Oct 2015
35-v1 Plan for MEBT measurements in FY16 (27 Oct 2015)
Alexander Shemyakin 27 Oct 2015
28-v1 RFQ Installation Status (29 Sep 2015)
Curtis Baffes et al. 29 Sep 2015
25-v2 Booster Transition Crossing (15 Sep 2015)
Valeri A. Lebedev 15 Sep 2015
23-v1 Possible PXIE-10 MeV Optics and Measurements (08 Sep 2015)
Arun Saini 08 Sep 2015
22-v1 Proposal for testing HWR cryomodule with a beam (PXIE-10MeV) (08 Sep 2015)
Alexander Shemyakin 04 Sep 2015
21-v1 Update of PXIE Beam Instrumentation (01 Sep 2015)
Vic E. Scarpine 02 Sep 2015
20-v1 Analysis of LEBT measurements (01 Sep 2015)
Jean-Paul Carneiro 01 Sep 2015
19-v1 Hardware for the Microphonics Control Test Stand (18 Aug 2015)
Jeremiah P. Holzbauer 18 Aug 2015
18-v2 Prototype MEBT Buncher Cavity Test (18 Aug 2015)
Vic E. Scarpine et al. 20 Aug 2015
13-v1 PXIE LEBT Commissioning Update (04 Aug 2015)
Lionel R. Prost 04 Aug 2015
12-v1 RFQ resonance control system update (04 Aug 2015)
Auralee Edelen et al. 04 Aug 2015
10-v1 RFQ coupler (28 Jul 2015)
Sergey Kazakov 28 Jul 2015
11-v1 PIP-II Vibration Breakdown (28 Jul 2015)
Jeremiah P. Holzbauer 03 Aug 2015
5-v1 PXIE RFQ installation plan (14 Jul 2015)
Curtis Baffes 14 Jul 2015
6-v1 PXIE RFQ Mechanical Construction Status (07 Jul 2015)
Jim Steimel 08 Jul 2015

Number of documents found: 105

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Users in Groups ] [ List Authors ] [ List Events ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact Service Desk



DocDB Version 8.8.9, contact Document Database Administrators
Execution time: 1 wallclock secs ( 0.48 usr + 0.12 sys = 0.60 CPU)