PIP-II


All PIP-II Documents

PIP-II-doc-# Title Author(s) Topic(s) Last Updated
1192-v2 EM & Mechanical Design of LB 650 MHz Cavities Ivan Gonin et al. LE 650
31 Oct 2017
1206-v1 Update on 200 Ohm kicker driver performance Daniil Frolov et al. Instrumentation
Front End
Technical Meeting
MEBT
PIP-II Collaboration
31 Oct 2017
1203-v1 Update on beam measurements with the 200 Ohm kicker Alexander Shemyakin MEBT
31 Oct 2017
1182-v1 Resonance Control of LB650MHz and HB650MHz SRF Cavities Yuriy M. Pischalnikov SC Linac
06 Oct 2017
1169-v1 Update on PIP2IT: beam through MEBT-3.0 Alexander Shemyakin Technical Meeting
02 Oct 2017
1166-v1 PIP-II Functional Requirements Specification Steve Holmes FRS
CD-1
02 Oct 2017
1158-v2 PIP2IT Design Handbook Paul Derwent LEBT
Front End
DR
MEBT
IS
RFQ
Technical Reports
27 Sep 2017
113-v8 PIP-II Conceptual Design Report Valeri A. Lebedev Rings
Software & Computing
PIP-II Collaboration
SC Linac
25 Sep 2017
1145-v1 Status of LB650MHz and HB650MHz SRF Cavities Tuner Yuriy M. Pischalnikov SC Linac
LLRF
20 Sep 2017
106-v1 Update on beam energy measurement of PI Test RFQ Vyaghri Sista Technical Meeting
18 Sep 2017
1100-v2 Transit Time Factor of a Multi-cell Standing Wave Cavity Jean-Francois Ostiguy SC Cavities & Cryomodules
13 Sep 2017
1106-v1 Beam Jitter in the PIP2IT MEBT Alexander Shemyakin et al. Technical Meeting
13 Sep 2017
1112-v1 Beam current measurements with resistive wall monitor Valeri A. Lebedev Instrumentation
Technical Meeting
12 Sep 2017
1094-v1 PIP2IT Ion Source Stability Study Bruce Hanna et al. Front End
Technical Meeting
IS
30 Aug 2017
1088-v1 Status of SSR1 cryomodules Donato Passarelli Technical Meeting
SSR
28 Aug 2017
1082-v1 HWR Cryomodule Update and Future Testing Plans Zack Conway Technical Meeting
24 Aug 2017
548-v3 Second Order Slip-factor Valeri A. Lebedev Beam Dynamics
23 Aug 2017
1076-v1 PIP-II cryomodule update and future testing plans Valeri A. Lebedev HWR
22 Aug 2017
1052-v2 Optics Measurement at MEBT-2 Arun Saini et al. Conceptual Development
Technical Meeting
Lattice Optics
08 Aug 2017
1046-v1 Simulations of the LEBT dipole and measured effect on the beam Jean-Paul Carneiro PXIE: IS/LEBT
01 Aug 2017
1013-v3 200 Ohm Chopper Progress Update Daniil Frolov et al. MEBT
PXIE: IS/LEBT
Publications
26 Jul 2017
160-v6 PMG Presentations Paul Derwent et al. Project Management
26 Jul 2017
1007-v1 Measurements of bunch-by-bunch kicking with 200 Ohm kicker Alexander Shemyakin Technical Meeting
MEBT
25 Jul 2017
896-v2 Update on PIP2IT warm front end Alexander Shemyakin Front End
Technical Meeting
19 Jul 2017
51-v2 UNCONTROLLED AND FOR REFERENCE ONLY - Top level PIP2IT drawings Curtis Baffes Front End
14 Jun 2017
593-v1 PIP2IT MEBT Absorber Status Update Curtis Baffes MEBT
13 Jun 2017
546-v1 Protection Electrode Signal Processing Algorithm Daniil Frolov et al. MEBT
PIP-II Collaboration
Instrumentation
09 May 2017
462-v1 Status of the HWR Cryomodule Production Andrei Lunin PIP-II Collaboration
HWR
25 Apr 2017
339-v1 Update on PIP2IT warm front end status Alexander Shemyakin Front End
03 Apr 2017
312-v1 LCLS-II CMs assembly at Fermilab Tug T. Arkan Technical Meeting
22 Mar 2017
289-v2 HEBT-0 Beam Dump MARS Simulations Summary Anthony Leveling et al. Technical Meeting
ES&H
22 Mar 2017
283-v2 Beam Current Measurements in the MPS Valeri A. Lebedev Instrumentation
15 Mar 2017
277-v1 Temporary High Energy Beam Transport line, HEBT-0 Alexander Shemyakin Front End
14 Mar 2017
271-v1 PIP2IT HEBT-0 FRS Alexander Shemyakin Front End
TRS
13 Mar 2017
223-v1 PIP2IT MEBT Kicker Protection Electrode Electronics FRS Daniil Frolov et al. MEBT
FRS
13 Mar 2017
205-v1 Analysis of long pulse data in MEBT Alexander Shemyakin MEBT
07 Mar 2017
199-v1 Emittance dilution due to beam motion Alexander Shemyakin et al. Beam Transport
07 Mar 2017
178-v1 Emittance Measurements in MEBT-13 Jean-Paul Carneiro Technical Meeting
28 Feb 2017
161-v1 MEBT Emittance Scanner Calibration Lionel R. Prost Instrumentation
Technical Meeting
MEBT
14 Feb 2017
158-v1 APS April Meeting Presentation Paul Derwent Technical Reports
07 Feb 2017
157-v1 LINAC 16 Presentation: PIP2IT Status Paul Derwent LEBT
Front End
MEBT
IS
RFQ
07 Feb 2017
149-v3 Next steps with PIP2IT front end Alexander Shemyakin Front End
Technical Meeting
25 Jan 2017
154-v1 PIP2IT MEBT Scanner Update Vic E. Scarpine Instrumentation
25 Jan 2017
153-v1 pCM test: Preliminary results Nikolay A. Solyak SC Cavities & Cryomodules
SC Linac
18 Jan 2017
135-v3 The 200 Ohm Kicker Protection Electrodes Beam Signals Levels Estimation Daniil Frolov et al. MEBT
Instrumentation
09 Jan 2017
134-v1 Estimation of dilution of a Fast Faraday Cup response due to the finite particles speed Alexander Shemyakin Instrumentation
MEBT
21 Dec 2016
133-v1 Summary of running in a “high-power” short MEBT configuration Alexander Shemyakin MEBT
13 Dec 2016
129-v1 PIP2IT CDS Renzhuo Wang Conceptual Development
Technical Meeting
22 Nov 2016
128-v1 Beam Dynamics inPIP2 Linac with 10 mA Alexander Sukhanov Technical Meeting
22 Nov 2016
126-v1 Reliability of PIP-II SRF tuners Yuriy M. Pischalnikov Controls
22 Nov 2016
125-v1 Status of the warm front end of PIP-II Injector Test Alexander Shemyakin Front End
Technical Meeting
08 Nov 2016
124-v1 Update on Laser Diagnostics Vic E. Scarpine Instrumentation
01 Nov 2016
1-v1 The PIP-II Reference Design Report Valeri A. Lebedev SC Linac
27 Oct 2016
117-v1 RFQ couplers update Sergey Kazakov RFQ
24 Oct 2016
109-v1 Charaterization of the MEBT Bunching Cavity Jim Steimel MEBT
13 Sep 2016
108-v1 Limitations and possible improvements of the Booster two-stage collimation Valeri A. Lebedev Booster
12 Sep 2016
105-v1 Radiation simulations of the MEBT dump Anthony Leveling et al. ES&H
06 Sep 2016
103-v1 Dark Current in PIP2 SRF Linac Alexander Sukhanov Technical Meeting
SC Cavities & Cryomodules
31 Aug 2016
104-v1 RFQ resonance control update: Control framework and initial results Daniel Bowring et al. Technical Meeting
31 Aug 2016
102-v2 Beam Size along the Pulse in PIP-II IT MEBT Ihar Lobach MEBT
12 Aug 2016
100-v1 PIP-II Injector Test LEBT Operation for the RFQ Jean-Paul Carneiro et al. LEBT
Technical Meeting
Lattice Optics
26 Jul 2016
98-v1 Update on couplers for SC resonators Sergey Kazakov SC Linac
19 Jul 2016
96-v3 PIP-II Injector Test’s mode of operation in FY17 Alexander Shemyakin MEBT
ES&H
15 Jul 2016
95-v1 Optics Measuremetn at MEBT 1.1 Arun Saini et al. Technical Meeting
MEBT
Lattice Optics
14 Jul 2016
94-v1 Software for optics measurements Arun Saini et al. MEBT
Software & Computing
Lattice Optics
14 Jul 2016
92-v1 RFQ Resonance Update Jim Steimel Technical Meeting
05 Jul 2016
91-v2 Status of the warm front end of PIP-II Injector Test (PXIE) Alexander Shemyakin Front End
21 Jun 2016
90-v1 Proposed Power Supplies for Cryogenic Magnets for PIP II Bruce Hanna SSR
HWR
21 Jun 2016
88-v1 PXIE Beam Instrumentation Status Update Vic E. Scarpine Technical Meeting
07 Jun 2016
87-v1 Current Status of PIP-II Resonance Control Warren Schappert All Meetings List
02 Jun 2016
85-v1 PXIE warm front end status Alexander Shemyakin Front End
03 May 2016
84-v1 Proposal to Use the Fermilab PIP-II Linac to Support a Low Energy Muon Program Eric Prebys PIP-II Collaboration
02 May 2016
83-v1 Analysis of the vacuum failure at PXIE on April 10, 2016 Alex Chen et al. Front End
28 Apr 2016
64-v3 Power Supplies for PXIE Cryomodules Valeri A. Lebedev Magnets
19 Apr 2016
81-v3 BPMs for the PIP-II linac Valeri A. Lebedev Instrumentation
Instrumentation
13 Apr 2016
82-v1 LB650 Cavity RF design upgrade Timergali Khabiboulline LE 650
HE 650
13 Apr 2016
77-v2 Update on PXIE front end status Alexander Shemyakin Front End
29 Mar 2016
76-v1 Focusing Solenoids for HINS LinacFront End and PXIE Test Stand:Alignment Studies Iouri Terechkine Magnets
23 Mar 2016
75-v1 Beam measurements at the PXIE LEBT Jean-Paul Carneiro PXIE: IS/LEBT
Lattice Optics
11 Mar 2016
74-v1 Modeling of the PXIE Solenoid Correctors with 3D Fields Jean-Paul Carneiro Magnets
PXIE: IS/LEBT
10 Mar 2016
73-v1 Preliminary High Energy Warm BPM Simulations Niral Patel Technical Meeting
08 Mar 2016
72-v1 Initial Analysis of PXIE RFQ X-ray Measurements Vic E. Scarpine RFQ
04 Mar 2016
71-v1 PXIE LEBT Chopper Driver Manual Greg Saewert LEBT
Instrumentation
03 Mar 2016
65-v1 PIP-II SRF Linac: Challenges, Issues and Status Vyacheslav Yakovlev Technical Meeting
SC Linac
17 Feb 2016
63-v1 PXIE Beam Instrumentation Status Update Vic E. Scarpine Instrumentation
09 Feb 2016
62-v1 PXIE RFQ Commissioning Status Jim Steimel Technical Meeting
RFQ
09 Feb 2016
61-v1 PXIE LEBT status update Lionel R. Prost LEBT
Front End
Technical Meeting
IS
09 Feb 2016
59-v1 Requirements to PIP-II Alignment Valeri A. Lebedev Beam Transport
SC Linac
03 Feb 2016
58-v2 Draft for PIP-II Machine Protection System (MPS) FRS Alexander Shemyakin Technical Meeting
SC Linac
02 Feb 2016
57-v1 Multipacting with space charge effect in PIP-II 650 MHz cavities Gennady Romanov LE 650
HE 650
28 Jan 2016
56-v1 SSR1 interface control document status update Curtis Baffes et al. SSR
26 Jan 2016
52-v1 CDR write-up Valeri A. Lebedev Project Management
12 Jan 2016
50-v1 PXIE Functional Requirements Specification Curtis Baffes et al. FRS
SC Linac
23 Dec 2015
46-v1 PIP-II MPS meeting Alexander Shemyakin All Meetings List
FRS
SC Linac
16 Dec 2015
47-v1 SSR1 Interface Control Document - Call for Assistance Donald Mitchell SSR
15 Dec 2015
42-v2 Conventional Facilities Tech Board Presentation Steve Dixon Civil Construction
14 Dec 2015
45-v2 Transfer Line Options Optics Alessandro Vivoli Beam Transport
04 Dec 2015
44-v1 RFQ Installation Status Jim Steimel Technical Meeting
RFQ
24 Nov 2015
41-v3 Update of PXIE FRS Alexander Shemyakin Front End
Technical Meeting
24 Nov 2015
39-v1 Optical Design of the PXIE MEBT scraping system Arun Saini et al. Technical Meeting
Lattice Optics
04 Nov 2015
38-v4 Transient Electromagnetic Analysis of MEBT Kickers for PXIE Mohamed Hassan Technical Meeting
04 Nov 2015
37-v1 PXIE RFQ Installation Status Jim Steimel Technical Meeting
RFQ
27 Oct 2015
36-v1 PXIE LEBT Status and Startup Plan Lionel R. Prost LEBT
Technical Meeting
IS
27 Oct 2015
35-v1 Plan for MEBT measurements in FY16 Alexander Shemyakin Technical Meeting
MEBT
27 Oct 2015
34-v1 PXIE MEBT Allison Emitance Scanner FRS Vic E. Scarpine et al. FRS
23 Oct 2015
33-v1 PXIE MEBT Buncher Cavity Prototype Commissioning Report Leonard Ristori et al. MEBT
Technical Reports
23 Oct 2015
30-v1 Best practices for minimizing vibration sources in ancillary systems - talk for microphonics workshop Curtis Baffes Microphonics & LFD
06 Oct 2015
28-v1 RFQ Installation Status Curtis Baffes et al. Front End
RFQ
29 Sep 2015
27-v1 H- Ion Source back plate cleaning HA Lionel R. Prost IS
ES&H
29 Sep 2015
24-v1 PIP-II / PXIE MPS meeting Alexander Shemyakin et al. Controls
16 Sep 2015
25-v2 Booster Transition Crossing Valeri A. Lebedev Technical Meeting
Beam Dynamics
15 Sep 2015
23-v1 Possible PXIE-10 MeV Optics and Measurements Arun Saini Technical Meeting
08 Sep 2015
22-v1 Proposal for testing HWR cryomodule with a beam (PXIE-10MeV) Alexander Shemyakin Front End
Technical Meeting
04 Sep 2015
21-v1 Update of PXIE Beam Instrumentation Vic E. Scarpine PIP-II Collaboration
Instrumentation
02 Sep 2015
20-v1 Analysis of LEBT measurements Jean-Paul Carneiro PXIE: IS/LEBT
Lattice Optics
01 Sep 2015
18-v2 Prototype MEBT Buncher Cavity Test Vic E. Scarpine et al. Front End
Technical Meeting
MEBT
20 Aug 2015
19-v1 Hardware for the Microphonics Control Test Stand Jeremiah P. Holzbauer Technical Meeting
18 Aug 2015
17-v1 PXIE MEBT Fast Faraday Cup FRS Vic E. Scarpine et al. FRS
14 Aug 2015
16-v1 PXIE MEBT Time of Flight FRS Vic E. Scarpine et al. FRS
14 Aug 2015
12-v1 RFQ resonance control system update Auralee Edelen et al. Front End
Technical Meeting
All Meetings List
RFQ
SC Linac
04 Aug 2015
13-v1 PXIE LEBT Commissioning Update Lionel R. Prost LEBT
Technical Meeting
04 Aug 2015
11-v1 PIP-II Vibration Breakdown Jeremiah P. Holzbauer Technical Meeting
03 Aug 2015
10-v1 RFQ coupler Sergey Kazakov Technical Meeting
All Meetings List
RFQ
SC Linac
28 Jul 2015
9-v1 RFQ Electrical Installation and Conditioning Vic E. Scarpine et al. RFQ
21 Jul 2015
8-v1 High Level RF for PXIE Ralph Pasquinelli RF Sources
15 Jul 2015
5-v1 PXIE RFQ installation plan Curtis Baffes Front End
Technical Meeting
All Meetings List
RFQ
14 Jul 2015
6-v1 PXIE RFQ Mechanical Construction Status Jim Steimel Technical Meeting
All Meetings List
RFQ
08 Jul 2015
4-v1 LEBT Commissioning Status Update Lionel R. Prost Technical Meeting
23 Jun 2015

Number of documents found: 128

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Users in Groups ] [ List Authors ] [ List Events ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact Service Desk



DocDB Version 8.7.23, contact Document Database Administrators
Execution time: 8 wallclock secs ( 1.12 usr + 0.37 sys = 1.49 CPU)