PIP-II


All PIP-II Documents

PIP-II-doc-# Title Author(s) Topic(s) Last Updated
4017-v5 Documents and links related to PIP2IT WFE optics measurements Lionel R. Prost Warm Front End
Accelerator Physics
Lattice Optics
10 Sep 2019
4039-v1 HWR Lid Lift/Removal Documentation Zack Conway et al. HWR
05 Sep 2019
3283-v14 Quality Control Plan Tracker Thomas A. Digrazia Quality
26 Aug 2019
1542-v1 PIP-II Review Plan John Anderson et al. Conventional Facilities
Beam Transport
Rings
SC Linac
Project Management
PIP-II Collaboration
Software & Computing
ES&H
06 Jul 2018
142-v9 PIP-II Quality Assurance Plan Jemila Adetunji Project Management
Quality
05 Jun 2019
1166-v6 ED0001222 PIP-II Global Requirements Document (draft) Steve Holmes et al. FRS
DOE Reviews
CD-1
30 Jul 2019
1539-v0 PIP-II Systems Engineering Management Plan John Anderson et al. Conventional Facilities
Beam Transport
Rings
SC Linac
Project Management
Software & Computing
PIP-II Collaboration
ES&H
06 Jul 2018
3406-v1 HESSS radiation map Alexander Shemyakin Instrumentation
Front End
23 Jul 2019
3400-v1 Notes on specifications for HEBT Emittance Slit-Slit Scanner (HESSS) Alexander Shemyakin Instrumentation
Front End
23 Jul 2019
163-v4 PIP-II Risk Management Plan Lucas Taylor DOE Reviews
SC Linac
Director's Reviews
Project Management
19 Jul 2019
172-v6 Project Management Plan for The Proton Improvement Plan-II Project Paul Derwent et al. CD-1
Project Management
08 Jul 2018
2261-v29 The PIP-II Preliminary Design Report Mary Convery et al. Technical Reports
16 Jul 2019
3030-v1 Finding beam loss locations in a linac with oscillating dipole correctors Alexander Shemyakin Accelerator Physics
01 May 2019
3024-v1 MPS-related devices at PIP2IT in its final configuration and suggestion for Mode Control program Alexander Shemyakin Controls
26 Apr 2019
2991-v2 The Possibility to Mitigate LFD Problem in PIP II Pulsed Operation Regime Vyacheslav Yakovlev et al. SC Linac
Project Management
21 Mar 2019
2970-v1 Opinion on absorbers between cryomodules in PIP-II SC linac Alexander Shemyakin Accelerator Physics
13 Mar 2019
105-v1 Radiation simulations of the MEBT dump Anthony Leveling et al. ES&H
11 Feb 2019
1666-v1 Characterization of Beam Motion at PIP2IT MEBT Jon Huber et al. Beam Transport
Lattice Optics
30 Nov 2018
2536-v1 Status of prototype SSR1 cryomodule for PIP-II Donato Passarelli SC Cavities & Cryomodules
SC Linac
SSR
28 Nov 2018
2530-v1 PIP-II 650 MHz Cryomodule Design and Transportation Vincent Roger LB650
HB650
SC Cavities & Cryomodules
SC Linac
SSR
27 Nov 2018
1642-v3 Procedure for finding an aperture restriction in a beam line Alexander Shemyakin Front End
Technical Meeting
26 Nov 2018
2285-v1 Proposal to add permanent diagnostics lines to PIP-II linac design Alexander Shemyakin Instrumentation
Beam Commissioning
13 Nov 2018
2249-v1 PIP-II Beam Instrumentation Update Vic E. Scarpine Technical Meeting
06 Nov 2018
2267-v1 Controls Modernization Workshop Recap Dennis Nicklaus Technical Meeting
Software & Computing
Controls
06 Nov 2018
2255-v1 Preparations for Cryomodule Installation at PIP2IT Curtis Baffes SC Linac
SSR
HWR
05 Nov 2018
2187-v3 Analysis of BPM harmonics at PIP2IT MEBT Alexander Shemyakin Instrumentation
Technical Meeting
MEBT
23 Oct 2018
2213-v1 Results of Testing the Fast Vacuum Protection Richard Andrews et al. All Meetings List
Technical Meeting
23 Oct 2018
1582-v6 PIP-II FDR MEBT kicker review Alex Chen et al. Front End
MEBT
Internal Reviews
22 Oct 2018
2193-v1 A Code for Longitudinal Dynamics in Synchrotrons, Jean-Francois Ostiguy Technical Meeting
16 Oct 2018
1430-v2 Booster Injection Girder for PIP-II David E. Johnson Beam Transport
Booster
Technical Meeting
10 Oct 2018
2160-v2 PIP2IT beam running plan for early 2019 Fernanda G. Garcia et al. Instrumentation
Front End
IS
RFQ
LEBT
Technical Meeting
MEBT
09 Oct 2018
1704-v3 Effect of image charges on differential trajectories measurements Alexander Shemyakin MEBT
Lattice Optics
09 Oct 2018
1710-v1 HWR Status and Plans for Completion Joe Ozelis Technical Meeting
HWR
02 Oct 2018
1680-v1 LLRF PIP2IT / 650 MHz Test Stand Status Update Ed Cullerton Technical Meeting
20 Sep 2018
1678-v1 Reliability of PIP2IT Warm Front End Bruce Hanna Technical Reports
18 Sep 2018
1672-v1 MPS Related Instrumentation and Development Work at PIP2IT Arden Warner Instrumentation
Technical Meeting
Software & Computing
12 Sep 2018
1654-v2 Characterization of 2.1 MeV H- Beam using Action-Phase Coordinates Chris J Richard et al. Instrumentation
Technical Meeting
MEBT
28 Aug 2018
1648-v1 Proposal for the High Energy Beam Transport (HEBT) design Alexander Shemyakin Front End
Technical Meeting
28 Aug 2018
1618-v1 PIP-II Cryomodule Development Genfa Wu Technical Meeting
17 Aug 2018
1612-v1 Summary of PIP2IT Spring’18 run Alexander Shemyakin Front End
Technical Meeting
13 Aug 2018
1594-v1 Proposal to use integration of current losses in PIP2IT MPS Alexander Shemyakin Front End
MEBT
Controls
31 Jul 2018
1588-v1 PIP-II Beam Transfers to Booster Brian E Chase Technical Reports
31 Jul 2018
1567-v1 Extinction measurement in MEBT Daniil Frolov Instrumentation
PIP-II Collaboration
30 Jul 2018
1554-v1 PIP-II RFQ Module 2 Braze Assembly Andrew Lambert RFQ
PIP-II Collaboration
19 Jul 2018
1527-v1 650 MHz couplers for PIP-II Sergey Kazakov SC Cavities & Cryomodules
22 Jun 2018
1509-v1 FFC Measurements at PIP-II Injector Test and corresponding Tracewin simulations Jean-Paul Carneiro Technical Meeting
MEBT
05 Jun 2018
113-v10 PIP-II Conceptual Design Report Valeri A. Lebedev Rings
SC Linac
Software & Computing
PIP-II Collaboration
04 Jun 2018
1505-v1 SSR1 Current Test Results Alexander Sukhanov Technical Meeting
15 May 2018
1502-v1 PIP2IT Cryogenics Distribution System Renzhuo Wang Technical Meeting
15 May 2018
1484-v3 Training plan for a PIP2IT operator Alexander Shemyakin ES&H
24 Apr 2018
1466-v2 CD-2/3a Preparation Kickoff Meeting Marc Kaducak et al. Project Management
12 Apr 2018
1454-v3 Optics Measurement at MEBT 3 Arun Saini Beam Transport
Technical Meeting
Lattice Optics
03 Apr 2018
1442-v2 Update on Q0 studies and material issues for PIP II SC cavities Saravan K. Chandrasekaran Technical Meeting
21 Mar 2018
1448-v2 PIP-II Project Status Steve Holmes Project Management
Technical Meeting
20 Mar 2018
1436-v1 Voltage and Phase Stabilization in SC Cavities Valeri A. Lebedev LLRF
19 Mar 2018
1418-v1 MPS Status Arden Warner Technical Meeting
27 Feb 2018
1409-v1 Non-Relativistic Ion Beam Diagnostics Chris J Richard All Meetings List
PIP-II Collaboration
21 Feb 2018
1365-v2 Update on PIP2IT warm front end Alexander Shemyakin Front End
Technical Meeting
06 Feb 2018
1371-v1 Update on FFC Measurements at PIP-II Injector Test Jean-Paul Carneiro Technical Meeting
06 Feb 2018
1359-v1 Status of couplers for PIP-II. Sergey Kazakov SC Cavities & Cryomodules
Technical Meeting
02 Feb 2018
1347-v1 PIP2IT MEBT 50-Ohm kicker deflection characterization Lionel R. Prost Technical Meeting
MEBT
30 Jan 2018
1320-v2 High Power (CW) Test of 50 Ohm Fast Kicker Ding Sun Technical Meeting
16 Jan 2018
1323-v1 Update of PIP2IT Beam Instrumentation Vic E. Scarpine Instrumentation
16 Jan 2018
71-v2 PXIE LEBT Chopper Driver Manual Greg Saewert Instrumentation
LEBT
10 Jan 2018
1302-v1 PIP2IT search and secure procedure Gary Lauten ES&H
22 Dec 2017
1293-v1 DOE ICR and IPR – Post-mortem Steve Holmes Technical Meeting
19 Dec 2017
1290-v1 List of PIP-II – related abstracts submitted to IPAC’18 Alexander Shemyakin Technical Meeting
19 Dec 2017
160-v10 PMG Presentations Paul Derwent et al. Project Management
18 Dec 2017
1278-v2 Update on PIP2IT warm front end Alexander Shemyakin Front End
MEBT
06 Dec 2017
1284-v4 Progress with SSR1, SSR2 cavities and cryomodule Donato Passarelli Technical Meeting
SSR
05 Dec 2017
1227-v1 Nov 28, 2017 Update on PIP2IT amplifiers David Peterson RF Sources
Technical Meeting
28 Nov 2017
1192-v2 EM & Mechanical Design of LB 650 MHz Cavities Ivan Gonin et al. LB650
31 Oct 2017
1206-v1 Update on 200 Ohm kicker driver performance Daniil Frolov et al. Instrumentation
Front End
Technical Meeting
MEBT
PIP-II Collaboration
31 Oct 2017
1203-v1 Update on beam measurements with the 200 Ohm kicker Alexander Shemyakin MEBT
31 Oct 2017
1182-v1 Resonance Control of LB650MHz and HB650MHz SRF Cavities Yuriy M. Pischalnikov SC Linac
06 Oct 2017
1169-v1 Update on PIP2IT: beam through MEBT-3.0 Alexander Shemyakin Technical Meeting
02 Oct 2017
1158-v2 PIP2IT Design Handbook Paul Derwent Front End
DR
IS
RFQ
Technical Reports
LEBT
MEBT
27 Sep 2017
1145-v1 Status of LB650MHz and HB650MHz SRF Cavities Tuner Yuriy M. Pischalnikov SC Linac
LLRF
20 Sep 2017
106-v1 Update on beam energy measurement of PI Test RFQ Vyaghri Sista Technical Meeting
18 Sep 2017
1100-v2 Transit Time Factor of a Multi-cell Standing Wave Cavity Jean-Francois Ostiguy SC Cavities & Cryomodules
13 Sep 2017
1106-v1 Beam Jitter in the PIP2IT MEBT Alexander Shemyakin et al. Technical Meeting
13 Sep 2017
1112-v1 Beam current measurements with resistive wall monitor Valeri A. Lebedev Instrumentation
Technical Meeting
12 Sep 2017
1094-v1 PIP2IT Ion Source Stability Study Bruce Hanna et al. Front End
IS
Technical Meeting
30 Aug 2017
1088-v1 Status of SSR1 cryomodules Donato Passarelli Technical Meeting
SSR
28 Aug 2017
1082-v1 HWR Cryomodule Update and Future Testing Plans Zack Conway Technical Meeting
24 Aug 2017
548-v3 Second Order Slip-factor Valeri A. Lebedev Beam Dynamics
23 Aug 2017
1076-v1 PIP-II cryomodule update and future testing plans Valeri A. Lebedev HWR
22 Aug 2017
1052-v2 Optics Measurement at MEBT-2 Arun Saini et al. Conceptual Development
Technical Meeting
Lattice Optics
08 Aug 2017
1046-v1 Simulations of the LEBT dipole and measured effect on the beam Jean-Paul Carneiro PXIE: IS/LEBT
01 Aug 2017
1013-v3 200 Ohm Chopper Progress Update Daniil Frolov et al. Publications
MEBT
PXIE: IS/LEBT
26 Jul 2017
1007-v1 Measurements of bunch-by-bunch kicking with 200 Ohm kicker Alexander Shemyakin Technical Meeting
MEBT
25 Jul 2017
896-v2 Update on PIP2IT warm front end Alexander Shemyakin Front End
Technical Meeting
19 Jul 2017
51-v2 UNCONTROLLED AND FOR REFERENCE ONLY - Top level PIP2IT drawings Curtis Baffes Front End
14 Jun 2017
593-v1 PIP2IT MEBT Absorber Status Update Curtis Baffes MEBT
13 Jun 2017
546-v1 Protection Electrode Signal Processing Algorithm Daniil Frolov et al. Instrumentation
MEBT
PIP-II Collaboration
09 May 2017
462-v1 Status of the HWR Cryomodule Production Andrei Lunin PIP-II Collaboration
HWR
25 Apr 2017
339-v1 Update on PIP2IT warm front end status Alexander Shemyakin Front End
03 Apr 2017
312-v1 LCLS-II CMs assembly at Fermilab Tug T. Arkan Technical Meeting
22 Mar 2017
289-v2 HEBT-0 Beam Dump MARS Simulations Summary Anthony Leveling et al. Technical Meeting
ES&H
22 Mar 2017
283-v2 Beam Current Measurements in the MPS Valeri A. Lebedev Instrumentation
15 Mar 2017
277-v1 Temporary High Energy Beam Transport line, HEBT-0 Alexander Shemyakin Front End
14 Mar 2017
271-v1 PIP2IT HEBT-0 FRS Alexander Shemyakin Front End
TRS
13 Mar 2017
223-v1 PIP2IT MEBT Kicker Protection Electrode Electronics FRS Daniil Frolov et al. FRS
MEBT
13 Mar 2017
205-v1 Analysis of long pulse data in MEBT Alexander Shemyakin MEBT
07 Mar 2017
199-v1 Emittance dilution due to beam motion Alexander Shemyakin et al. Beam Transport
07 Mar 2017
178-v1 Emittance Measurements in MEBT-13 Jean-Paul Carneiro Technical Meeting
28 Feb 2017
161-v1 MEBT Emittance Scanner Calibration Lionel R. Prost Instrumentation
Technical Meeting
MEBT
14 Feb 2017
158-v1 APS April Meeting Presentation Paul Derwent Technical Reports
07 Feb 2017
157-v1 LINAC 16 Presentation: PIP2IT Status Paul Derwent Front End
IS
RFQ
LEBT
MEBT
07 Feb 2017
149-v3 Next steps with PIP2IT front end Alexander Shemyakin Front End
Technical Meeting
25 Jan 2017
154-v1 PIP2IT MEBT Scanner Update Vic E. Scarpine Instrumentation
25 Jan 2017
153-v1 pCM test: Preliminary results Nikolay A. Solyak SC Cavities & Cryomodules
SC Linac
18 Jan 2017
135-v3 The 200 Ohm Kicker Protection Electrodes Beam Signals Levels Estimation Daniil Frolov et al. Instrumentation
MEBT
09 Jan 2017
134-v1 Estimation of dilution of a Fast Faraday Cup response due to the finite particles speed Alexander Shemyakin Instrumentation
MEBT
21 Dec 2016
133-v1 Summary of running in a “high-power” short MEBT configuration Alexander Shemyakin MEBT
13 Dec 2016
129-v1 PIP2IT CDS Renzhuo Wang Conceptual Development
Technical Meeting
22 Nov 2016
128-v1 Beam Dynamics inPIP2 Linac with 10 mA Alexander Sukhanov Technical Meeting
22 Nov 2016
126-v1 Reliability of PIP-II SRF tuners Yuriy M. Pischalnikov Controls
22 Nov 2016
125-v1 Status of the warm front end of PIP-II Injector Test Alexander Shemyakin Front End
Technical Meeting
08 Nov 2016
124-v1 Update on Laser Diagnostics Vic E. Scarpine Instrumentation
01 Nov 2016
1-v1 The PIP-II Reference Design Report Valeri A. Lebedev SC Linac
27 Oct 2016
117-v1 RFQ couplers update Sergey Kazakov RFQ
24 Oct 2016
109-v1 Charaterization of the MEBT Bunching Cavity Jim Steimel MEBT
13 Sep 2016
108-v1 Limitations and possible improvements of the Booster two-stage collimation Valeri A. Lebedev Booster
12 Sep 2016
103-v1 Dark Current in PIP2 SRF Linac Alexander Sukhanov SC Cavities & Cryomodules
Technical Meeting
31 Aug 2016
104-v1 RFQ resonance control update: Control framework and initial results Daniel Bowring et al. Technical Meeting
31 Aug 2016
102-v2 Beam Size along the Pulse in PIP-II IT MEBT Ihar Lobach MEBT
12 Aug 2016
100-v1 PIP-II Injector Test LEBT Operation for the RFQ Jean-Paul Carneiro et al. LEBT
Technical Meeting
Lattice Optics
26 Jul 2016
98-v1 Update on couplers for SC resonators Sergey Kazakov SC Linac
19 Jul 2016
96-v3 PIP-II Injector Test’s mode of operation in FY17 Alexander Shemyakin MEBT
ES&H
15 Jul 2016
95-v1 Optics Measuremetn at MEBT 1.1 Arun Saini et al. Technical Meeting
MEBT
Lattice Optics
14 Jul 2016
94-v1 Software for optics measurements Arun Saini et al. MEBT
Software & Computing
Lattice Optics
14 Jul 2016
92-v1 RFQ Resonance Update Jim Steimel Technical Meeting
05 Jul 2016
91-v2 Status of the warm front end of PIP-II Injector Test (PXIE) Alexander Shemyakin Front End
21 Jun 2016
90-v1 Proposed Power Supplies for Cryogenic Magnets for PIP II Bruce Hanna SSR
HWR
21 Jun 2016
88-v1 PXIE Beam Instrumentation Status Update Vic E. Scarpine Technical Meeting
07 Jun 2016
87-v1 Current Status of PIP-II Resonance Control Warren Schappert All Meetings List
02 Jun 2016
85-v1 PXIE warm front end status Alexander Shemyakin Front End
03 May 2016
84-v1 Proposal to Use the Fermilab PIP-II Linac to Support a Low Energy Muon Program Eric Prebys PIP-II Collaboration
02 May 2016
83-v1 Analysis of the vacuum failure at PXIE on April 10, 2016 Alex Chen et al. Front End
28 Apr 2016
64-v3 Power Supplies for PXIE Cryomodules Valeri A. Lebedev Magnets
19 Apr 2016
81-v3 BPMs for the PIP-II linac Valeri A. Lebedev Instrumentation
Instrumentation
13 Apr 2016
82-v1 LB650 Cavity RF design upgrade Timergali Khabiboulline LB650
HB650
13 Apr 2016
77-v2 Update on PXIE front end status Alexander Shemyakin Front End
29 Mar 2016
76-v1 Focusing Solenoids for HINS LinacFront End and PXIE Test Stand:Alignment Studies Iouri Terechkine Magnets
23 Mar 2016
75-v1 Beam measurements at the PXIE LEBT Jean-Paul Carneiro PXIE: IS/LEBT
Lattice Optics
11 Mar 2016
74-v1 Modeling of the PXIE Solenoid Correctors with 3D Fields Jean-Paul Carneiro Magnets
PXIE: IS/LEBT
10 Mar 2016
73-v1 Preliminary High Energy Warm BPM Simulations Niral Patel Technical Meeting
08 Mar 2016
72-v1 Initial Analysis of PXIE RFQ X-ray Measurements Vic E. Scarpine RFQ
04 Mar 2016
65-v1 PIP-II SRF Linac: Challenges, Issues and Status Vyacheslav Yakovlev SC Linac
Technical Meeting
17 Feb 2016
63-v1 PXIE Beam Instrumentation Status Update Vic E. Scarpine Instrumentation
09 Feb 2016
62-v1 PXIE RFQ Commissioning Status Jim Steimel RFQ
Technical Meeting
09 Feb 2016
61-v1 PXIE LEBT status update Lionel R. Prost Front End
IS
LEBT
Technical Meeting
09 Feb 2016
59-v1 Requirements to PIP-II Alignment Valeri A. Lebedev Beam Transport
SC Linac
03 Feb 2016
58-v2 Draft for PIP-II Machine Protection System (MPS) FRS Alexander Shemyakin SC Linac
Technical Meeting
02 Feb 2016
57-v1 Multipacting with space charge effect in PIP-II 650 MHz cavities Gennady Romanov LB650
HB650
28 Jan 2016
56-v1 SSR1 interface control document status update Curtis Baffes et al. SSR
26 Jan 2016
52-v1 CDR write-up Valeri A. Lebedev Project Management
12 Jan 2016
50-v1 PXIE Functional Requirements Specification Curtis Baffes et al. FRS
SC Linac
23 Dec 2015
46-v1 PIP-II MPS meeting Alexander Shemyakin All Meetings List
FRS
SC Linac
16 Dec 2015
47-v1 SSR1 Interface Control Document - Call for Assistance Donald Mitchell SSR
15 Dec 2015
42-v2 Conventional Facilities Tech Board Presentation Steve Dixon Conventional Facilities
14 Dec 2015
45-v2 Transfer Line Options Optics Alessandro Vivoli Beam Transport
04 Dec 2015
44-v1 RFQ Installation Status Jim Steimel RFQ
Technical Meeting
24 Nov 2015
41-v3 Update of PXIE FRS Alexander Shemyakin Front End
Technical Meeting
24 Nov 2015
39-v1 Optical Design of the PXIE MEBT scraping system Arun Saini et al. Technical Meeting
Lattice Optics
04 Nov 2015
38-v4 Transient Electromagnetic Analysis of MEBT Kickers for PXIE Mohamed Hassan Technical Meeting
04 Nov 2015
37-v1 PXIE RFQ Installation Status Jim Steimel RFQ
Technical Meeting
27 Oct 2015
36-v1 PXIE LEBT Status and Startup Plan Lionel R. Prost IS
LEBT
Technical Meeting
27 Oct 2015
35-v1 Plan for MEBT measurements in FY16 Alexander Shemyakin Technical Meeting
MEBT
27 Oct 2015
34-v1 PXIE MEBT Allison Emitance Scanner FRS Vic E. Scarpine et al. FRS
23 Oct 2015
33-v1 PXIE MEBT Buncher Cavity Prototype Commissioning Report Leonard Ristori et al. Technical Reports
MEBT
23 Oct 2015
30-v1 Best practices for minimizing vibration sources in ancillary systems - talk for microphonics workshop Curtis Baffes Microphonics & LFD
06 Oct 2015
28-v1 RFQ Installation Status Curtis Baffes et al. Front End
RFQ
29 Sep 2015
27-v1 H- Ion Source back plate cleaning HA Lionel R. Prost IS
ES&H
29 Sep 2015
24-v1 PIP-II / PXIE MPS meeting Alexander Shemyakin et al. Controls
16 Sep 2015
25-v2 Booster Transition Crossing Valeri A. Lebedev Technical Meeting
Beam Dynamics
15 Sep 2015
23-v1 Possible PXIE-10 MeV Optics and Measurements Arun Saini Technical Meeting
08 Sep 2015
22-v1 Proposal for testing HWR cryomodule with a beam (PXIE-10MeV) Alexander Shemyakin Front End
Technical Meeting
04 Sep 2015
21-v1 Update of PXIE Beam Instrumentation Vic E. Scarpine Instrumentation
PIP-II Collaboration
02 Sep 2015
20-v1 Analysis of LEBT measurements Jean-Paul Carneiro PXIE: IS/LEBT
Lattice Optics
01 Sep 2015
18-v2 Prototype MEBT Buncher Cavity Test Vic E. Scarpine et al. Front End
Technical Meeting
MEBT
20 Aug 2015
19-v1 Hardware for the Microphonics Control Test Stand Jeremiah P. Holzbauer Technical Meeting
18 Aug 2015
17-v1 PXIE MEBT Fast Faraday Cup FRS Vic E. Scarpine et al. FRS
14 Aug 2015
16-v1 PXIE MEBT Time of Flight FRS Vic E. Scarpine et al. FRS
14 Aug 2015
12-v1 RFQ resonance control system update Auralee Edelen et al. Front End
All Meetings List
RFQ
SC Linac
Technical Meeting
04 Aug 2015
13-v1 PXIE LEBT Commissioning Update Lionel R. Prost LEBT
Technical Meeting
04 Aug 2015
11-v1 PIP-II Vibration Breakdown Jeremiah P. Holzbauer Technical Meeting
03 Aug 2015
10-v1 RFQ coupler Sergey Kazakov All Meetings List
RFQ
SC Linac
Technical Meeting
28 Jul 2015
9-v1 RFQ Electrical Installation and Conditioning Vic E. Scarpine et al. RFQ
21 Jul 2015
8-v1 High Level RF for PXIE Ralph Pasquinelli RF Sources
15 Jul 2015
5-v1 PXIE RFQ installation plan Curtis Baffes Front End
All Meetings List
RFQ
Technical Meeting
14 Jul 2015
6-v1 PXIE RFQ Mechanical Construction Status Jim Steimel All Meetings List
RFQ
Technical Meeting
08 Jul 2015
4-v1 LEBT Commissioning Status Update Lionel R. Prost Technical Meeting
23 Jun 2015

Number of documents found: 194

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Users in Groups ] [ List Authors ] [ List Events ] [ List Topics ]

--------
Security, Privacy, Legal
Fermilab Policy on Computing
Fermi National Accelerator Laboratory

For assistance contact Service Desk



DocDB Version 8.8.9, contact Document Database Administrators
Execution time: 14 wallclock secs ( 2.09 usr + 0.86 sys = 2.95 CPU)